Moulded HDPE attenuation crate used in blue roof system to create a 40mm water retention and drainage layer.

They allow free movement of water across the roof towards the restricted outlets.
They are installed directly over the waterproofing layer (usually with a protection fleece)
They are often paired with 40mm+ flow restrictors to control the release rate of stormwater, often designed to discharge over a 24-hour period.
Welcome to the ABG Building Solutions website for Blue & Green roof systems, to visit the main ABG Geosynthetics site please go to:
www.abg-geosynthetics.com