VF HD+ 150 Void Former

The high density 150mm deep void former (700kpa) works in tandem with a restrictor chamber, which controls the final discharge rate into the building’s drainage outlets.

VF HD+ 150 Void Former

The void former acts as an “attenuation and drainage void” within the roof buildup.

  • Controlled Storage: During heavy rain, it temporarily holds excess water that cannot immediately be discharged due to site-specific flow restrictions
  • Source Control: By managing water at the roof level, it helps meet Sustainable Drainage Systems (SuDS) requirements and often eliminates the need for expensive underground storage tanks
  • Structural Support: It provides a stable base for various surface finishes, including green roofs, paving, and even vehicle-access areas
  • Material Design: Typically high-density geocomposite structures with high compressive strength.
  • Void Capacity: Offers over 90% void space for maximum water storage efficiency.

Additional information

Welcome to the ABG Building Solutions website for Blue & Green roof systems, to visit the main ABG Geosynthetics site please go to:
www.abg-geosynthetics.com